Construction Progress Photos January 2010 Tuesday, January 19, 2010 Share on Facebook
East Side of Building
North Front of Building
West Side of Building
Construction Progress Photos November-December 2009 Tuesday, December 08, 2009 Share on Facebook
East Side of Building November 5, 2009
West Side of Building November 19, 2009
Raquetball Courts Demolition December 1, 2009
West Side of Building December 1, 2009
West Side of Building December 3, 2009
Building Enhancement Drawings Monday, October 26, 2009 Share on Facebook
Concourse/Main Level
Event/Lower Level
Suite/Upper Level
Overall Site Plan
The above drawings represent the foot print of the Building and Property as it will look when the construction is completed in 2012.
Construction Progress Photos October 2009 Wednesday, October 21, 2009 Share on Facebook
Wide Shot East Side of Building September 30, 2009
General Office South West Parking Lot September 25, 2009
New Electrical Room South West Lower Level September 25, 2009
West Side of Building Construction Area September 25, 2009
North East Side of Building September 25, 2009
Construction
to Date:
As part of Phase I construction the
following work has been completed:
Upgrades to various utility services (sewer, gas,
electrical).
Outside precast panel walls measuring 31’ X 5’ and
weighing 8,000 pounds each were removed.
Initial work on the foundation footings for the new
outside wall has begun.
New outside walls will be built during the 2009-10
season.
WHAT TO EXPECT ON YOUR NEXT VISIT TO THE ENMAX CENTRE Monday, October 05, 2009 Share on Facebook
General Information: The City of
Lethbridge ENMAX Centre expansion and renovation project started construction
in May 2009. The purpose of this project is to improve existing services and to
continue to meet and/or exceed the needs and expectations of our customers and
business partners.
The
improvements to the building will allow the facility to compete in the
increasingly competitive market place for the next 25 years. The building space
is currently 151,833 sq. ft., through this expansion an additional 40,809 sq.
ft will be added creating an overall total space of 192,642 sq. ft.This project is scheduled to be completed
over a 3 year period from 2009-2012. During these 3 years the building will be
open to the public and fully operational from October-April of each
construction year.
Construction to Date: As part of
Phase I construction the following work has been completed:
• Upgrades
to various utility services (sewer, gas, electrical). • Outside
precast panel walls measuring 31’ X 5’ and weighing 8,000 pounds each were
removed. • Initial
work on the foundation footings for the new outside wall has begun. • New
outside walls will be built during the 2009-10 event season.
General Offices: ENMAX
Centre General Office & Hurricanes Office have been relocated for the
duration of the 3 year enhancement project. Our offices are now located in
trailers on the West side of our building in the South end of the parking lot. CLICK HERE FOR MAP
All contact
information, phone numbers and emails will remain the same for the General
Office, Hurricanes Office and Ticket Centre.
Ticket Centre: The Ticket
Centre located at the ENMAX Centre will be operating in its original location
under its normal hours until May 2010.
Washrooms: The
washrooms in our facility will not be affected for the 2009-2010 Season.
Seating: Due to the
elimination of various exit doors the building occupant capacity has been
reduced by 1,000 available seats for hockey and other events. Seating capacity
for hockey games will be 4,000 seats and concerts 5,600 available seats during
this Phase of the construction.
Food & Beverage: All
concessions at the facility will be fully operational through this season. The
Mini Melts concession stand previously located on the SW corner of the
concourse will not be operating for this season.
Hurricane Souvenir Store: The
Souvenir store will be temporarily located on the SW corner of the concourse.
(Previously the Mini Melts location)
Information Centre: Customers
who need assistance during Hockey Games or Special Events are encouraged to
visit the Information Centre which will be located in the old Hurricanes
Souvenir Shop on the North West end of the building for the 2009-2010 Season.
Parking & Football Field: Parking in
the West Lot has been reorganized to accommodate ENMAX Centre and Hurricanes
staff all other parking at the facility remains the same for public use at
events.
The
football field located on the East side of the building is presently housing
construction equipment for the expansion and will operate in the future as an
additional parking lot.
Luxury Suites: Two of our
Luxury Box Suites at the North end of the building have been vacated and will
be demolished in preparation for the addition of 16 new suites.
Fire & Safety: Fire
Marshals will be on site to assist in directing patrons to the nearest exits
and out of the building in the event of an emergency evacuation. CLICK HERE FOR MAP